SPECIAL OUTREACHING CRANES and TRAILING RUNWAYS
- Sometimes trucks may have problems to enter into small workshops or customer find no places outside steel construction for loadings. In such cases creating more loading areas out of workshops Bayursan suggest two types of solutions.
- Creating more loading areas out of workshops with outreaching Cranes and Trailing Runways electricall moving longitudinally in and out, back or forth or both through out the hall.
- Sometimes with suspended secondary girders electrically moving under the main girders while crossing out the runways off the hall at left or right sides.
- These systems are adviced up to 16 tons and up to 4 meters away of hall and mostly for suspended EOT Cranes.